Gallery


Gallery

Bathroom renovation in Hanover, Nov 2013

(approx $3,000)

  • Old vanity and faucets etc
  • old tile coming loose and leaking
  • Removing old tile
  • New tile being installed on new cement backerboard (Durock)
  • New whirlpool tub and new tile
  • New tub & shower faucets
  • New Vanity top and faucets
  • Finished with new toilet and flooring
Old vanity and faucets etc1 old tile coming loose and leaking2 Removing old tile3 New tile being installed on new cement backerboard (Durock)4 New whirlpool tub and new tile5 New tub & shower faucets6 New Vanity top and faucets7 Finished with new toilet and flooring8
Bootstrap Carousel by WOWSlider.com v4.3

Bathroom renovation Owen Sound, Jan 2014

(approx $3,500)

  • Old bathroom had a surround that was leaking
  • In need of renovation
  • Water and mold behind old surround
  • Old surround removed to expose molding plaster walls
  • Old plaster removed
  • Old steel tub removed
  • Old toilet still had lead pipes
  • 100 yr old plumbing
  • Old plumbing replaced and new subloor installed and levelled
  • New tub & faucets installed and walls tiled
  • New tile
  • New toilet and flooring
  • New vanity, top,faucets and mosaic tile
Old bathroom had a surround that was leaking1 In need of renovation2 Water and mold behind old surround3 Old surround removed to expose molding plaster walls4 Old plaster removed5 Old steel tub removed6 Old toilet still had lead pipes7 100 yr old plumbing8 Old plumbing replaced and new subloor installed and levelled9 New tub & faucets installed and walls tiled10 New tile11 New toilet and flooring12 New vanity, top,faucets and mosaic tile13
Bootstrap Carousel by WOWSlider.com v4.3

Window replacement, Durham Dental office Oct 2013

(8 windows  approx $6,000)

  • Historic registry office in Durham
  • Currently a Dental clinic
  • Old windows in need of replacement
  • old steel windows being removed
  • more removal of old windows
  • Interior of new windows
  • Finishing trim installed
  • Lower sash in Clinic section has Cardinal rain glass for privacy
Historic registry office in Durham1 Currently a Dental clinic2 Old windows in need of replacement3 old steel windows being removed4 more removal of old windows5 Interior of new windows6 Finishing trim installed7 Lower sash in Clinic section has Cardinal rain glass for privacy8
Bootstrap Carousel by WOWSlider.com v4.3

Bathroom renovation Flesherton, Aug 2014

(Approx $3,500)

  • IMG_20140728_093312
  • Old cracked walls
  • New floorOnce the old tub was removed it was discovered that the floor was completely rotten and needed re-framing and new sub floor
  • Strapping wallsI had to cut 1 x 2's in wedges to straighten the walls which were out by 3"
  • Strapped and insulated
  • New cement backerboard installedStrapping complete and new cement backerboard installed and ready for tile
  • New subway tileHomeowner selected 4" x 16" shite glossy "subway" tile with 2 rows of black
  • Tiling
  • IMG_20140731_180132
  • Ceiling lightDecided to tile the ceiling over the tub and add a waterproof light
  • New faucet setGrouting finished and Faucet finishing trim installed.
  • IMG_20140801_183509
  • Untitled1
IMG_20140728_0933121 Old cracked walls2 New floor3 Strapping walls4 Strapped and insulated5 New cement backerboard installed6 New subway tile7 Tiling8 IMG_20140731_1801329 Ceiling light10 New faucet set11 IMG_20140801_18350912 Untitled113
Bootstrap Carousel by WOWSlider.com v4.3

Apartment renovations for “Revera” retirement homes in Hanover & Kincardine

I completed approx 15 units in 2014, some 1 bedroom and some 2 bedroom.

  • Completely re-painted and new closets
  • New bulkheads for closet doors
  • New closets doors installed and all new carpets
  • Old bathroom gutted and ready for renovation
  • Tub replaced with shower base and new tile
  • Finished bathroom
  • Another finished unit
Bootstrap Carousel by WOWSlider.com v4.3

Bathroom renovation near Dornoch, Aug 2014

(Approx $3,200)

  • Unforseen problemsBathroom renovation complicated by rotten floor that needed repair and plumbing moved etc...
  • Replacing plumbingAnd supporting floor under tub area
  • New Customer picked out tile that looked like slate
  • TilingFloor gets 12" x 24" tile walls are 12" x 12" with 2 rows of 2" on top
  • More tiling
  • CompleteI went back to look at another project for same customer and took pictures of finished bathroom
  • Curved shower curtain rod
  • Finished
Unforseen problems1 Replacing plumbing2 New 3 Tiling4 More tiling5 Complete6 Curved shower curtain rod7 Finished8
Bootstrap Carousel by WOWSlider.com v4.3

New kitchen backsplash for same customer that had the slate tile bathroom above

(Approx $400)

  • Old tile removed
  • Old tile removed
  • New tile
  • Laser levelLaser level used to ensure tile is perfecly level from one end to the other
  • Tile behind stove
  • Top edge tile
  • Looking good
  • cutouts for electrical
Old tile removed1 Old tile removed2 New tile3 Laser level4 Tile behind stove5 Top edge tile6 Looking good7 cutouts for electrical8
Bootstrap Carousel by WOWSlider.com v4.3

Glass replacement near Hanover   Oct 2014

  • IMG_20141024_164226
  • Glass replacementAll 8 lites at the back of house were replaced with new energy efficient Low-e Glass at a fraction of the cost of complete new windows
IMG_20141024_1642261 Glass replacement2
Bootstrap Carousel by WOWSlider.com v4.3

Video of before & After renovation of apartment in retirement home

Please see facebook page for gallery of more recently completed projects